Wednesday, March 31, 2010

Buildings

• Seal exterior cracks/openings/gaps with caulk, gasketing, weatherstripping, etc.
• Consider new thermal doors, thermal windows, roofing insulation, etc.
• Install windbreaks near exterior doors.
• Replace single-pane glass with insulating glass.
• Consider covering some window and skylight areas with insulated wall panels inside the building.
• If visibility is not required but light is required, consider replacing exterior windows with insulated glass block.
• Consider tinted glass, reflective glass, coatings, awnings, overhangs, draperies, blinds, and shades for sunlit exterior windows.
• Use landscaping to advantage.
• Add vestibules or revolving doors to primary exterior personnel doors.
• Consider automatic doors, air curtains, strip doors, etc. at high-traffic passages between
conditioned and non-conditioned spaces. Use self-closing doors if possible.
• Use intermediate doors in stairways and vertical passages to minimize building stack effect.
• Use dock seals at shipping and receiving doors.
• Bring cleaning personnel in during the working day or as soon after as possible to minimize
lighting and HVAC costs.

No comments: