Wednesday, March 31, 2010

CHECKLIST & TIPS FOR ENERGY EFFICIENCY

Electricity
• Optimise the tariff structure with utility supplier
• Schedule your operations to maintain a high load factor
• Shift loads to off-peak times if possible.
• Minimise maximum demand by tripping loads through a demand controller
• Stagger start-up times for equipment with large starting currents to minimize load peaking.
• Use standby electric generation equipment for on-peak high load periods.
• Correct power factor to at least 0.90 under rated load conditions.
• Relocate transformers close to main loads.
• Set transformer taps to optimum settings.
• Disconnect primary power to transformers that do not serve any active loads
• Consider on-site electric generation or cogeneration.
• Export power to grid if you have any surplus in your captive generation
• Check utility electric meter with your own meter.
• Shut off unnecessary computers, printers, and copiers at night.

No comments: